Managing Challenges, Avoiding Disputes, and Managing Change Risks
Dr. Eng. Hussein Gomaa, Consultant Engineer
Other courses
Contracts and Claims Management Dr. Consulting Engineer / Hussein Jumaah
FIDIC Red Book ContractsDr. Eng. / Consulting Engineer Hussein Gomaa
FIDIC Contracts Course
Instructor: Consulting Engineer Dr. Hussein Gomaa
Property Science Platform
We welcome your collaboration and invite you to join us in enriching the real estate community with the latest technologies in virtual reality and artificial intelligence, as well as emerging technologies.
Managing Challenges, Avoiding Disputes, and Managing Change Risks
Dr. Eng. Hussein Gomaa, Consultant Engineer
| No | Subject | Description |
| 1 | Course Title | Managing Challenges, Avoiding Disputes, and Managing Change Risks |
| 2 | Target Audience | Engineers, accountants, and professionals working in contracts and claims management within the construction and building sector. |
| 3 | Course Objectives | Explaining the causes of claims, their various types, and methods for preventing and avoiding them. |
| 4 | Scientific Content of the Program | 1. Sequence of engineering works.
2. Sequence of architectural and structural execution works. 3. Sequence of contractual works (for construction works and consultancy services). 4. Methods of implementing Total Quality Control (TQC) and its role in reducing disputes. 5. Performance rates, cost calculations, and their role in reducing disputes. 6. Local and international contracts. 7. Definition of claims. 8. Causes of claims in construction projects. 9. Types of claims. 10. Workshops. |
| 5 | Training tools and requirements | Laptop – Flipchart – Data show – LCD display screen |
| 6 | Training method | Theoretical explanation – Workshops – Discussion sessions – Exercises – Site visits if available |
*These courses can be conducted online
Why Choose Us
Donec tortor felis, pharetra sit amet elit sit amet, molestie gravida neque. Duis in nibh nec ex consectetur venenatis a eget nulla. Praesent elementum, lacus non lobortis tristique.
01
Trusted Specialist
Skilled engineers, architects, and builders.
02
Quality Materials
Using only trusted and durable materials.
03
Client Satisfaction
Transparent communication and reliable service.
Frequently Asked Questions
How long does it take to complete a residential construction project?
The timeline depends on the project size, typically ranging from 6 months to 1 year lacus non lobortis tristique, lacus nunc porta enim, non volutpat velit tellus et erat.
Do you offer eco-friendly and sustainable construction options?
Yes, we specialize in using green building materials and energy-efficient designs lacus non lobortis tristique, lacus nunc porta enim, non volutpat velit tellus et erat.
Can you help with permits and legal requirements?
Absolutely, our team assists with all necessary documentation and permits. lacus non lobortis tristique, lacus nunc porta enim, non volutpat velit tellus et erat.